1. FEASIBILITY STUDIES AND PRODUCT DEVELOPMENT

First steps for New Product Development is to perform feasability studies, establish technical requirement, graphic design and drawing, brand identity, and to realize prototype as proof of concept

2. INDUSTRIAL DESIGN AND ELECTRONIC ENGINEERING

Second step is to perform industrial design (CAD) for molded part and tooling, draw and perform electronics board and system design, operate firmware and software development

3. PROCUREMENT AND SUB-SUPPLIER COORDINATION

Third step is to perform procurement of components and materials, sub-supplier management, order control,  logistics and delivery coordination, IQC (Incoming Quality Control) and warehousing

4. ASSEMBLY, INSPECTION AND PACKAGING

Last step will be to perform sub-parts (components) and parts assembly to create a final usable product: Perform in-process quality control, electrical and mechanical testing, operate final quality control, marking, labelling and packaging.

Firmware Development in China

 

Our engineers got the capability to customize firmware on electornics product in order to fit end customer demand: modify and adpat functionality, modify user interface, schedule task, or change behavior of your electronics product

Read more...

Our company address

1

PAG Electronics - Shenzhen  

Shahe industry area, Baishizhou, Nanshan District, Shenzhen, 518053, China
2

PAG Electronics - Shanghai

Room 1019, No.100 Nanshan Road, Shanghai, China